Call Us Today! 604.294.9191|info@loadpath.ca

Mining

Gahcho Kue Diamond Mine Gahcho Kue Diamond Mine

Gahcho Kue Diamond Mine

Gahcho Kue Diamond Mine

Location: DeBeers Gahcho Kue, NWT.

Supply and installation of the structure and building envelope for the Truck Shop and Emulsion Buildings. Supply and installation of the building envelope for the production building.

Copper Mountain Mine – Primary Crusher Building Copper Mountain Mine – Primary Crusher Building

Copper Mountain Mine – Primary Crusher Building

Copper Mountain Mine – Primary Crusher Building

LoadPath is once again back up at Copper Mountain Mine, selected to construct the latest mine building, a 4,000 sq.ft. x 110 ft tall Coarse Ore Stockpile Feed – Primary Crusher building.

Gibraltar Mine – Truck Shop Gibraltar Mine – Truck Shop

Gibraltar Mine – Truck Shop

Gibraltar Mine – Truck Shop

Taseko Mines with All North Consulting – Supply and Install of a new Truck Shop. 25,000 sq.ft.

Gibraltar Mine – Grinding/Flotation/Tailings Buildings Gibraltar Mine – Grinding/Flotation/Tailings Buildings

Gibraltar Mine – Grinding/Flotation/Tailings Buildings

Gibraltar Mine – Grinding/Flotation/Tailings Buildings

This Gibraltar Mine’s phase 3 expansion includes a new processing plant. LoadPath worked through a detailed design phase, collaborating closely with Ausenco Engineering to complete this very large project through the winter and have the building complex ready for Spring 2012. Total constructed works by LoadPath exceeded $20 Million and included conventional structural steel in various interior portions of the project.

Teck Quintette Mine – Truck Shop Teck Quintette Mine – Truck Shop

Teck Quintette Mine – Truck Shop

Teck Quintette Mine – Truck Shop

Eight bay truck shop with wash bay and maintenance shop. Design-build turn-key. IDL Projects is the project General Contractor, with LoadPath providing design, supply and install of the steel structures. (In progress)

Wolverine Mine – Yukon Zinc Company Wolverine Mine – Yukon Zinc Company

Wolverine Mine – Yukon Zinc Company

Wolverine Mine – Yukon Zinc Company

Acting in a key alliance partnership with Yukon Zinc Corporation, Garco Buildings Systems invited LoadPath, with its partner Still Creek Engineering, to provide assistance with engineering, detailed design and procurement of the many required building components. The assignment included 3 heavy industrial structures: a 60,000 sq. ft. Mill Building supporting 25, 10 and 5 tonne bridge cranes; a 25,000 sq. ft. Concentrate Loadout Building and a 6,000 sq. ft. Crusher Building with 5 tonne crane. Wardrop Engineering was the project prime consultant.

Copper Mountain Mine – Concentrator Building Copper Mountain Mine – Concentrator Building

Copper Mountain Mine – Concentrator Building

Copper Mountain Mine – Concentrator Building

This 120,000 sq. ft. mine production building was completed in 2010 and supports 50/10 tonne and 15 tonne bridge cranes. LoadPath partnered with Garco Buildings on this project to design, supply and erect this heavy industrial building structure.  LoadPath worked under the direction of Merit Consultants and Hatch Engineers, who were the prime consultants responsible for the construction of the Copper Mountain Mine project.

The Journal of Commerce did an article on LoadPath’s contribution to the Copper Mountain Mine. Read the article HERE.

Gibraltar Mine – Moly Filtration Building Gibraltar Mine – Moly Filtration Building

Gibraltar Mine – Moly Filtration Building

Gibraltar Mine – Moly Filtration Building

This 16,000 sq. ft. structure will enclose the mine’s expanded moly filtration process.  Designed and fabricated summer 2011, the building structure was substantially completed in November 2011.  LoadPath worked under Ausenco Engineering to complete the project.

Copper Mountain Mine – Truck Shop Building Copper Mountain Mine – Truck Shop Building

Copper Mountain Mine – Truck Shop Building

Copper Mountain Mine – Truck Shop Building

Similco Mines, Copper Mountain project is one of BC’s newest mines.  This 20,000 sq. ft. mine production building supports a 50 tonne bridge crane.  Completed in 2010, this building provides maintenance facilities for the mine haul trucks and other equipment.  LoadPath partnered with Garco Buildings on this project to design, supply and erect this heavy industrial building structure.  LoadPath worked under the direction of Merit Consultants and Hatch Engineers, who were the prime consultants responsible for the construction of the Copper Mountain Mine project.
The Journal of Commerce recently did an article on LoadPath’s contribution to the Copper Mountain Mine. Read the article HERE.

Gibraltar Mine – Tailings Disposal Building, Architectural Materials Gibraltar Mine – Tailings Disposal Building, Architectural Materials

Gibraltar Mine – Tailings Disposal Building, Architectural Materials

Gibraltar Mine – Tailings Disposal Building, Architectural Materials

The cladding, high speed rubber door and other materials to enclose this structure were provided to Gibraltar mine in 2009.  LoadPath worked under Hatch consultants to complete the supply of these materials.