Project Description

Location: Mcleese Lake, British Columbia (BC)

This Gibraltar Mine’s phase 3 expansion includes a new processing plant. LoadPath worked through a detailed design phase, collaborating closely with Ausenco Engineering to complete this very large project through the winter and have the building complex ready for Spring 2012. Total constructed works by LoadPath exceeded $20 Million and included conventional structural steel in various interior portions of the project.