Industrial

BCTC Harewood West Substation Building BCTC Harewood West Substation Building

BCTC Harewood West Substation Building

BCTC Harewood West Substation Building

Constructed under sub-contract for UGL Infrastructure Canada, this building was designed to meet “post-disaster” code and strict QA/QC requirements.

Tla-o-qui-aht First Nation, Canoe Creek, Run-of-River Generation Building Tla-o-qui-aht First Nation, Canoe Creek, Run-of-River Generation Building

Tla-o-qui-aht First Nation, Canoe Creek, Run-of-River Generation Building

Tla-o-qui-aht First Nation, Canoe Creek, Run-of-River Generation Building

LoadPath’s assignment on this project was to provide a powerhouse structure that could be combined with natural wood siding to fit into the site.   Completed for the Barkley Project Group, this building houses a 5.5MW turbine generator.  It included removable roof paneling and a small column mounted jib crane for use in future plant servicing.  LoadPath is pleased to have been part of this very green and socially responsible project.

BC Hydro Instrument Shack BC Hydro Instrument Shack

BC Hydro Instrument Shack

BC Hydro Instrument Shack

This tiny building was custom fabricated to house some specialty electronics and made to quickly drop into the field using a truck-mounted crane.  We were a bit amused at how much it looks like a traditional out-building of a different sort.

BC Hydro Substation BC Hydro Substation

BC Hydro Substation

BC Hydro Substation

Constructed under sub-contract for Black and McDonald, this building was designed to meet “post-disaster” code and strict QA/QC requirements.

Canfor Pulp and Paper – Water Treatment Building Canfor Pulp and Paper – Water Treatment Building

Canfor Pulp and Paper – Water Treatment Building

Canfor Pulp and Paper – Water Treatment Building

Working under Franzen Engineering, LoadPath completed design work for project construction during winter 2011/12.  The building houses a new boiler water treatment plant. The building contains numerous water treatment tanks and piping to clean and process water for use in the mill recovery boiler.  Part of LoadPath’s scope was a hot dipped galvanized structure tied into our building columns and supporting a 50,000lb Electrical Control Booth.